The design of modern operating room should not only meet the installation space of supporting equipment, but also meet the requirements of air purification level. At the same time, it should be prepared for future development and more intelligent expansion.
1. The operating room is divided into field welding spraying and non welding pre spraying.
2. The framework structure of the operating room is composed of galvanized square pipes. The wallboard is made of electrolytic board, stainless steel, glass wallboard and other materials. The back is pasted with 12mm gypsum board.
3. The installation forms of operating room include octagonal wall and three-dimensional arc angle wall. Ingenious use of space can greatly reduce the impact of indoor dead angle on clean air flow, enhance the strength of operating room, and make cleaning and maintenance more convenient.
4. All steel structures are processed in the factory and assembled on site to improve the production efficiency and ensure the processing accuracy.
09-17
What are the requirements for the material of air duct in Jiangmen operating room
The main air duct connected to the purification of the operating room is the main air duct, and the air duct from the main air duct is the branch air duct. The raw material requirements of air duct
09-17
What work should be done in the purification project of Jiangmen operating room
Although the operation room purification is only a part of the medical unit, it is the preparation work before the operation, but it has invented an outstanding medical environment for the patients.